Clarkson Alliance (as lead partner), Kier Clearbox (as software partner) and Worthing Homes (as host project partner) are currently undertaking a Technology Strategy Board co-funded research project “to establish the changes in dynamics and behaviours across the construction supply chain to unlock new, more efficient and collaborative ways of working with Building Information Modelling (BIM)”. This is the second in our series of updates about the project. Transitioning into a Level 2 BIM environment

In our last post we reported that our Meadow Road sheltered housing project had moved away from the usual single stage design and build tender to a two stage tender process. The first stage tender has now concluded, a contractor has been appointed and a full design team assembled. The team are now in the process of developing a BIM Execution Plan. Once this is complete the project will move online and into, Clearbox’s BIMXtra Level 2 BIM environment.

BIMXtra is a central ‘middleware’ platform that will allow the project team to use a range of authoring tools – Autodesk Revit, Microsoft Excel, etc – to import data into, and export data from, a single, federated BIM model. With freely available software the BIM model can also be viewed by the wider project team, facilitating engagement across the entire supply chain.

Worthing Homes will therefore be able to view the BIM model as the design develops, as will all of the main contractor’s sub-contractors and suppliers. It is important to recognise however that there is still a need for drawings in traditional 2D format and for the relevant standards and procedures to be incorporated into the BIM Execution Plan.

Read the rest of the article on the CIC blog.