Littlehampton Leisure Centre

Arun District Council built a new leisure centre as part of the council’s commitment to improve leisure services for the local community. Clarkson Alliance provided Project and Cost Management services. 

The centre includes

  • an eight-lane 25-metre swimming pool
  • a training pool with moveable floor
  • an 80-85 station gym
  • a dance studio which can divide into two spaces
  • a spinning studio
  • a café
  • a multi-purpose room/meeting room and sauna

It was erected on the site of the current sports dome and overflow car park. The new building was constructed adjacent to the existing Littlehampton Swimming Centre, which was demolished.

Enabling works were completed on time in August 2017 and main construction of the leisure centre began in September 2017. The project was delivered using Building Information Modelling (BIM) and the completed centre opened as scheduled in April 2019.

Services provided

Services provided:

  • Clarkson Alliance is providing cost and project management services.
  • Client: Arun District Council
  • Contract: NEC Option A

Copyright: Arun District Council

 

 Related news and projects

New Appointment – Windsor Great Park

New Appointment – Windsor Great Park

Cost Management (Quantity Surveyor) Appointment, Windsor Great Park The cost management (quantity surveying) team at Clarkson Alliance have been appointed for an interesting new project at the wonderful 17th Century Grade II listed Cumberland Lodge Mews, Windsor Great...

Windsor Girls’ School Royal Opening

Windsor Girls’ School Royal Opening

Windsor Girls' School Sixth Form Royal Opening We were delighted to be invited along to celebrate the royal opening of Windsor Girls' Sixth Form by HRH The Duke of Edinburgh on 16th January 2024. Clarkson Alliance provided both cost and project management to deliver a...